Exercises

Exercise I: maintenance

Organize the process of repainting all walls of a large lecture hall at a university. The walls are in good condition, so a single coat of pain suffices. The process therefore can be reduced to the following tasks:

  • Make a model of the lecture hall in BIM using direct measurements and photographs
  • Classify wall surfaces and their parts with respect to:
    • Labour (e.g. painting parts narrower than 30 cm are more time consuming)
    • Equipment (e.g. parts higher than 220 cm require scaffolding)
    • Accessibility (e.g. parts behind radiators or other fixed obstacles are hard to reach and therefore also time consuming)
  • Measure the wall surfaces
  • Make cost estimates
  • Make a time schedule in 4D BIM

Deliverables

  1. Process and information diagrams, accompanied by short explanatory comments
  2. Basic model of the lecture hall in a BIM editor
  3. Schedules for classification, measurement, estimates and scheduling in BIM

Roles

If the exercise is a group assignment, consider roles for the following aspects:

  • Process management
  • Information management
  • BIM modelling (two or more people)
  • Analyses in BIM (using schedules – two or more people)

License

Share This Book

Feedback/Errata

Comments are closed.